With the lumber schlepped around to the back yard, the framing began. There were several challenges with framing up the new structure and joining it cleanly to the existing house while making it all look like the new addition was built at the same time as the original house.
Our carpenter (Nathan) did a great job of pulling it all together. He is an interesting guy with a rather rough and colorful history (and loves colorful language), but he has great carpentry skills. He had a rough time keeping helpers. He fired two different helpers during the course of our construction and ended up doing a lot of the final work alone or with a couple helpers that TriStar (our general contractor) provided.
Below are a few pictures of the framing as it progressed.
Subscribe to:
Post Comments (Atom)
Picking Fixtures and Tile
April 2018 - As the work progressed, we needed to pick out the plumbing fixtures, tile and countertop that we would be using in our ne...
-
Final version (2.2) of the layout for the new master bedroom and bathroom. We signed the contract to construct the new master bedroom an...
-
With the lumber schlepped around to the back yard, the framing began. There were several challenges with framing up the new structure and ...
-
April 2018 - After completing the framing, Nathan began work on the siding. We chose a siding that matched the style of the existing house...





No comments:
Post a Comment