April 2018 - After the framing and roofing were done, it was time for electrical, plumbing and hvac rough in work. Due to the low pitch of the roof line as it tied into the existing house, there wasn't a whole lot of room in the attic space, but they were able to fit everything they needed in. You can see why they all wanted to get all their rough in work done before the sheetrock went on the ceiling.
Subscribe to:
Post Comments (Atom)
Picking Fixtures and Tile
April 2018 - As the work progressed, we needed to pick out the plumbing fixtures, tile and countertop that we would be using in our ne...
-
Final version (2.2) of the layout for the new master bedroom and bathroom. We signed the contract to construct the new master bedroom an...
-
With the lumber schlepped around to the back yard, the framing began. There were several challenges with framing up the new structure and ...
-
April 2018 - After completing the framing, Nathan began work on the siding. We chose a siding that matched the style of the existing house...