April 2018 - After the framing and roofing were done, it was time for electrical, plumbing and hvac rough in work. Due to the low pitch of the roof line as it tied into the existing house, there wasn't a whole lot of room in the attic space, but they were able to fit everything they needed in. You can see why they all wanted to get all their rough in work done before the sheetrock went on the ceiling.