Finishing up the Framing and New Roof

April 2018 - After finishing up the framing, Nathan installed the new sliding glass door, the windows and the panel boards and tape that seal up the exterior walls from wind and air penetration. While Nathan was working on all that the roofing side of TriStar came and removed the old roof and installed our new roofing on both the new addition and the old house. 