April 2018 - After finishing up the framing, Nathan installed the new sliding glass door, the windows and the panel boards and tape that seal up the exterior walls from wind and air penetration. While Nathan was working on all that the roofing side of TriStar came and removed the old roof and installed our new roofing on both the new addition and the old house.
Sunday, September 23, 2018
Wednesday, April 25, 2018
The Utility Room Gets a Facelift
Zita decided that we needed to go ahead and get a washer and dryer at the Denton house. At first, we thought it might be alright to just put them in the utility room for now until we did the remodel work on the existing house.
On closer inspection, I decided I really needed to go ahead and remodel the utility room before we put anything in it. I could tell that the walls had gotten wet at some point and there had just been cheap paneling nailed over the old sheet rock.
So, I set to work.
Below are pictures of the process, from tearing out the old sheet rock and insulation to re-insulating, installing the green board sheet rock (designed for damp areas like bathrooms and utility rooms), tape and plastering the new sheet rock seems, sanding the seems, and then painting it all, and a picture of the completed utility room.
On closer inspection, I decided I really needed to go ahead and remodel the utility room before we put anything in it. I could tell that the walls had gotten wet at some point and there had just been cheap paneling nailed over the old sheet rock.
So, I set to work.
Below are pictures of the process, from tearing out the old sheet rock and insulation to re-insulating, installing the green board sheet rock (designed for damp areas like bathrooms and utility rooms), tape and plastering the new sheet rock seems, sanding the seems, and then painting it all, and a picture of the completed utility room.
Framing Up the New Addition
With the lumber schlepped around to the back yard, the framing began. There were several challenges with framing up the new structure and joining it cleanly to the existing house while making it all look like the new addition was built at the same time as the original house.
Our carpenter (Nathan) did a great job of pulling it all together. He is an interesting guy with a rather rough and colorful history (and loves colorful language), but he has great carpentry skills. He had a rough time keeping helpers. He fired two different helpers during the course of our construction and ended up doing a lot of the final work alone or with a couple helpers that TriStar (our general contractor) provided.
Below are a few pictures of the framing as it progressed.
Our carpenter (Nathan) did a great job of pulling it all together. He is an interesting guy with a rather rough and colorful history (and loves colorful language), but he has great carpentry skills. He had a rough time keeping helpers. He fired two different helpers during the course of our construction and ended up doing a lot of the final work alone or with a couple helpers that TriStar (our general contractor) provided.
Below are a few pictures of the framing as it progressed.
The Lumber Arrives
![]() |
| Lumber being dropped off in the front yard. |
Bright and early one morning, a semi pulled up in front of the house and dropped off a little load of lumber. The carpenter (Nathan) and his helper arrived shortly after and they began carrying the lumber into the back yard.
![]() |
| Part of the lumber that has been carried to the back yard. |
Thursday, March 15, 2018
The Foundation
![]() |
| "Beams" Through the Fill Dirt |
![]() |
| Plumbing Rough In |
The concrete company installs the steel rebar throughout the slab area and in the beams (the deep trenches where the concrete will be poured). Once again, when everything is ready for concrete, the City has to inspect the foundation and the rebar and sign off before the concrete can be ordered.
The black plastic keeps the ground from pulling water out of the wet concrete too fast while it is curing. It also prevents water from seeping up through the cured concrete from the ground in the future.
The entire slab, beams, stem wall and porch are poured at once in what is called a "monolithic pour". This provides added strength to the foundation.
![]() |
| Concrete Truck and Concrete Pump |
![]() |
| Concrete Being Pumped to the Foundation |
![]() |
| Smoothing Everything Out |
![]() |
| Finishing Touches |
![]() |
| Foundation is Done |
Making Hay While the Sun Isn't Shining
![]() | |
| The "Old" Shed (Before Repainting) |
![]() |
| Working on the Shed |
![]() |
| Painting the Shed Roof |
One of the other things the shed needed was the door to be rebuilt. It was falling apart. Luckily I could remove the door and do a lot of that work under the car port and inside the house while it was raining.
![]() |
| Re-skinning and Painting the Shed Door |
![]() |
| The Repainted and Refurbished Shed |
It came out looking pretty good.
Ready, Set, Go! ...then Stop.
![]() |
| The Martinez Brothers Leveling the Site |
The Martinez Brothers (concrete contractor that is building the foundation) got started leveling the site and bringing in fill dirt on Monday, February 12th.
![]() |
| Fill Dirt |
Turns out that getting rain right at this point of time in the construction is a mixed blessing. Although it brought everything to a halt until the rain stopped, all that rain helped to compact the fill dirt, which is good for ensuring that you don't have problems with your foundation later on.
So, although it was frustrating to have to go into wait mode again, right after we finally got started, I guess we'll try to look on the bright side.
Subscribe to:
Posts (Atom)
Picking Fixtures and Tile
April 2018 - As the work progressed, we needed to pick out the plumbing fixtures, tile and countertop that we would be using in our ne...
-
Final version (2.2) of the layout for the new master bedroom and bathroom. We signed the contract to construct the new master bedroom an...
-
Layout for the New Addition (Master Bedroom and Bathroom) We met with our designer (Renee) on the layout for the first phase of our r...
-
The "Old" Shed (Before Repainting) During the few days of sunshine in between the on again and off again rain, I began working...